AC | Asphalt Concrete |
A.B | Anchor Bolt Or Asbestos Board |
APM | Assistant Project Manager |
AE | Assistant Engineer |
A.S.T.M | American Society for Testing Materials |
A.S.C | Allowable stress of concrete |
A.R.E.A | American Railway Engineering Association |
A.C.I | American concrete institute |
A.A.S.H.T.O | American Association of State Highway Transport |
BWK | Brick Work |
BRW | Brick Retaining Wall |
BOQ | Bill Of Quantities |
BLK | Block Work |
BHK | Bedroom, Hall, Kitchen |
B.O.F | Bottom Of Foundation |
B.M | Bending moment |
B.M | Benchmark |
CS | Comparative statement |
CRW | Concrete Retaining Wall |
CPM | Critical path method |
CP | Cement plaster |
CMU | Concrete Masonry Unit |
CL | Centre Line |
CJ | Construction Joint |
CIP | Cast In Place |
CE | Chief Engineer |
CC | Centre To Centre |
CC | Cement concrete |
CBW | Concrete Block Wall |
C.I.Sheet | Corrugated Iron sheet |
C.I.Pipe | Cast iron pipe |
DWLS | Dowels |
DRG | Drawings |
DPR | Daily Progress Report |
DPC | Damp proof course |
DL | Development Length |
DIM | Dimension |
Dia | Diameter |
D.L | Dead load |
ELCB | Earth Leak Circuit Breaker |
EL | Existing Load |
EJ | Expansion Joint |
EGL | Existing ground level |
E.L | Environmental load |
Ft | Foot Or Feet |
FOC | Factor Of Safety |
FL | Floor Level |
FGL | Formation ground level |
F.M | Fineness Modulus |
GP | Ground plane |
GL | Ground Level |
HP | Horizontal plane |
HFL | Highest flood level |
HAC | High Alumina Cement |
ISI | Indian Standard Institute |
IOM | Inter Office Memo |
JST | Joist |
JE | Junior Engineer |
Kg | Kilogram |
LWC | Light Weight Concrete |
LW | Light Weight |
LC | Lime concrete |
L.L | Live load |
MT | Metric Tonnes |
MRC | Material Receipt Challan |
MM | Millimeter |
MFL | Maximum Flood Level |
MEP | Mechanical Electrical Plumbing |
MCB | Miniature Circuit Breaker |
MB | Measurement book |
M | Meter |
NCF | Neat cement finishing |
N | Newton |
OSR | Open Space Reservation Area |
OPC | Ordinary Portland Cement |
OGL | Original ground level |
PWD | Permanent Works Engineer |
PVC | Polyvinyl Chloride |
PSI | Pound Per Square Inch |
PSF | Pound Per Square Foot |
PPR | Poly Propylene Random |
PPE | Personal Protective Equipment |
PO | Purchase Order |
PM | Project Manager |
PL | Plinth level |
PERT | Program Evaluation and Review Technique |
PCC | Plain Cement Concrete |
PC | Precast Concrete |
PC | Pile Cap |
QS | Quantity Surveyor |
QC | Quality control |
RMC | Ready Mixed Concrete concrete |
RL | Reduced level |
RCC | Reinforced Cement Concrete |
RC | Reinforced Concrete |
RBC | Reinforced Brick concrete |
R.B.W | Reinforced brickwork |
SWG | Standard wire gauge |
STP | Sewage Treatment Plant |
SRC | Sulphate Resisting Cement |
SCC | Self Compacting Concrete |
TOW | Top Of Wall |
TOC | Top Of Concrete |
TOB | Top Of Beam |
TMT | Thermo Mechanical Treatment |
TDS | Total Dissolved Solids |
TBM | Tunnel Boring Machine |
TB | Tie Beam |
U.S.C | Ultimate stress of concrete |
UPVC | Unplasticized Polyvinyl chloride |
USD | Ultimate strength design |
VP | Vertical plane |
W.C | Water closet |
W.S.D | Working stress design |
WL | Working Level |
WO | Work Order |